Solutions personnalisées pour l'entretien des voies

JG150ST 15-Ton Wheeled Excavator for High-Speed Railway Sleeper Replacement.
The JG150ST 15-Ton Wheeled Excavator revolutionizes railway sleeper replacement with its robust design and exceptional mobility. Engineered for rapid, precise operations in diverse terrains, it features advanced hydraulic systems that minimize downtime and labor costs, while its wheeled configuration ensures easy transport and setup. Ideal for global infrastructure projects, this machine offers enhanced durability, user-friendly controls for safety, and seamless integration with standard attachments, making it a top choice for contractors seeking reliable, high-performance solutions to upgrade rail networks and boost productivity worldwide.
Numéro d'article :
JG150STCommande (MOQ) :
1Paiement :
L/C or T/TOrigine du produit :
ChinaCouleur :
yellowPort d'expédition :
xiamenDélai de mise en œuvre :
15-45daysPoids :
15000KG
Hundreds of sleepers can be replaced within a few hours, shortening the maintenance time of the lines, reducing the downtime of railways and improving operational efficiency.It has reduced the direct exposure of workers at the track site and lowered the accident rate. The overall safety of the working environment has been improved.Ensure that each sleeper is accurately replaced to enhance the stability and durability of the track and extend the service life of the railway.
|
Sleeper changer attachment |
|
|
Max. opening width of grab |
650mm |
|
Min. opening width of grab |
200mm |
|
Max. radius grabbing weight |
0.8~1.0t |
|
Max. width of grab |
3000mm(customizable) |
|
Grapple rotation angle |
360° |
|
Dimensions |
|
|
(Length*width*height) Transport dimensions |
9700*2500*3100mm |
|
Axle base |
2750mm |
|
The track wheel travels the wheelbase |
4500mm |
|
The track wheel ADAPTS to the gauge |
1000-1700(customizable) |
|
Wheel base (front/rear) |
1900mm |
|
Ground clearance of counterweight |
1290mm |
|
Min. ground clearance |
310mm |
|
Back-end radius of gyration |
2250mm |
|
Tech performance and specification |
|
|
Working efficiency |
≥40pcs/h |
|
Angle of rotation |
360° |
|
Machine weight |
15300kg |
|
Engine model |
Cummins(EuroⅢ) |
|
Rated power |
93KW/103kw |
|
Rated speed |
2200r/min |
|
Note: Product parameters are subject to physical objects, and the right of interpretation and final interpretation belongs to the company. |
|
Product Overview
15ton Wheel Type Hirail Sleeper Changer Excavator Railway Excavator
This equipment combines professionalism and reliability, significantly simplifying the complex process of traditional rail sleeper replacement. Its modular design is adaptable to various types of rail sleepers and working environments, reducing manual intervention while ensuring construction accuracy and effectively shortening the downtime for line maintenance. Choosing JG150ST means equipping the railway maintenance team with an efficient, labor-saving and reliable assistant, helping to extend the lifespan of the tracks and ensuring the safety of train operations.

Product Advantages

Effiient:Hundreds of sleepers can be replaced within a few hours, shortening the maintenance time of the lines, reducing the downtime of railways and improving operational efficiency.
Safety:It has reduced the direct exposure of workers at the track site and lowered the accident rate. The overall safety of the working environment has been improved.
Precision:Ensure that each sleeper is accurately replaced to enhance the stability and durability of the track and extend the service life of the railway.
Application scenarios


Q&A
Q: What are the main functions and advantages?
A: Efficient and automated replacement of railway sleepers, supporting multiple track specifications, and made of durable materials.
Q: Delivery time and mode of transportation?
A: The standard delivery time is 30 to 45 days, and sea transportation is supported.
Q: After-sales service?
A: We have established a global service system covering pre-sale, in-sale and after-sale services, and can respond to customer demands within 48 hours. Remote technical support and rapid global spare parts supply ensure that equipment malfunctions are resolved promptly.
Q: Is there support for machine customization to adapt to the track standards of different countries?
A: Yes, parameters can be customized as needed, on-site installation guidance and technical training are provided to meet the diverse demands of the world.