Solutions personnalisées pour l'entretien des voies

JG80S 8-ton wheeled railway excavator: High-efficiency sleeper replacement equipment
The JG80S 8-Ton Wheeled Railway Excavator is engineered for superior performance in railway sleeper replacement tasks, offering unmatched efficiency and reliability in demanding rail maintenance operations. Featuring a robust 8-ton capacity and wheeled mobility, this excavator enables quick deployment and precise handling across diverse track environments. Key innovations include an advanced hydraulic system for smooth sleeper removal and installation, reinforced steel chassis for durability, and ergonomic controls to reduce operator fatigue. Ideal for railway maintenance crews and construction firms, it ensures rapid sleeper renewal with minimal downtime, boosting productivity on rail networks worldwide. Its compact design ensures maneuverability in confined spaces, while corrosion-resistant materials guarantee longevity in harsh weather conditions. Choose the JG80S for a cost-effective, high-output solution that enhances safety and precision in rail infrastructure projects.
Numéro d'article :
JG80SCommande (MOQ) :
1Paiement :
L/C or T/TOrigine du produit :
ChinaCouleur :
yellowPort d'expédition :
xiamenDélai de mise en œuvre :
15-45daysPoids :
8000kgHundreds of sleepers can be replaced within a few hours, shortening the maintenance time of the lines, reducing the downtime of railways and improving operational efficiency.It has reduced the direct exposure of workers at the track site and lowered the accident rate. The overall safety of the working environment has been improved.Ensure that each sleeper is accurately replaced to enhance the stability and durability of the track and extend the service life of the railway.
|
Sleeper changer attachment |
|
|
Max. opening width of grab |
650mm |
|
Min. opening width of grab |
200mm |
|
Max. radius grabing weight |
0.8t |
|
Max. width of grab |
2800mm |
|
Grapple rotation angle |
360° |
|
Dimensions |
|
|
(Length*width*height)Transport dimensions |
6500x2200x2900mm |
|
Axle base |
2500mm |
|
Width of wheel |
2160mm |
|
Ground clearance of counterweight |
1060mm |
|
Min. ground clearance |
≥280mm |
|
Back-end radius of gyration |
1920mmmm |
|
Tech performance and specification |
|
|
Applicable railway gauge |
Customizable |
|
Working efficiency |
≥40pcs/h |
|
Angle of rotation |
360° |
|
Machine weight |
8000kg |
|
Engine model |
YUCHAI(EuroⅢ) |
|
Rated power |
55KW |
|
Rated speed |
2200r/min |
|
Hydraulic system working pressure |
25Mpa |
|
Hydraulic system flow |
150L/min |
|
Variable piston pump |
72ml/r |
|
Maximum traction |
35KN |
|
Walking speed |
25km/h |
|
Rail wheel speed |
20km/h |
|
Climbing grade |
58%30° |
|
Fuel tank capacity |
150L/min |
|
Hydraulic oil tank capacity |
110L |
|
Note: The product parameters are based on the actual product, and the right of interpretation and final interpretation belong to the company. |
|
Product Overview
JG80S 8ton wheeled railway excavator railway sleeper replacement excavator
Engineered to revolutionize rail infrastructure upkeep, the JG80S8 Railway Sleeper Replacement Excavator integrates versatility with industrial-grade durability. Its modular design allows rapid adaptation to diverse tasks, from excavating hardened ballast layers to delicately positioning new sleepers without damaging adjacent tracks. The wheeled configuration offers unparalleled mobility for swift transitions between job sites, while corrosion-resistant alloys in critical components extend service life in humid or coastal regions. Advanced load-sensing hydraulics deliver consistent power output even under variable loads, ensuring smooth operations during prolonged shifts. With a focus on sustainability, the machine’s energy-efficient engine reduces emissions without compromising torque, making it a future-ready choice for rail networks committed to eco-conscious maintenance practices.


Product Advantages

Effiient:Hundreds of sleepers can be replaced within a few hours, shortening the maintenance time of the lines, reducing the downtime of railways and improving operational efficiency.
Safety:It has reduced the direct exposure of workers at the track site and lowered the accident rate. The overall safety of the working environment has been improved.
Precision:Ensure that each sleeper is accurately replaced to enhance the stability and durability of the track and extend the service life of the railway.
Application scenarios


Q&A
Q: What are the main functions and advantages?
A: Efficient and automated replacement of railway sleepers, supporting multiple track specifications, and made of durable materials.
Q: Delivery time and mode of transportation?
A: The standard delivery time is 30 to 45 days, and sea transportation is supported.
Q: After-sales service?
A: We have established a global service system covering pre-sale, in-sale and after-sale services, and can respond to customer demands within 48 hours. Remote technical support and rapid global spare parts supply ensure that equipment malfunctions are resolved promptly.
Q: Is there support for machine customization to adapt to the track standards of different countries?
A: Yes, parameters can be customized as needed, on-site installation guidance and technical training are provided to meet the diverse demands of the world.